COD PROIECT: 120402
New generation power plant for power support in critical infrastructures
ACRONIM: W-ISS-E
Disponibil începând cu: December 2023
Descriere:

The key features that describe the innovation are efficiency and flexibility.

These are provided by the construction of 3 energy solutions (2.5 kW, 15 kW and 100 kW), which are ideally suited to critical infrastructures in energy inaccessible areas, by integrating different power sources (fossil fuel electric generator and hydrogen fuel cells) and predictive maintenance related to operating conditions.

FINANȚARE:
Competitiveness Operational Programme 2014-2020
IMPLEMENTARE: 2021 – 2023
VALOARE PROIECT: 29.048.344 RON

COORDONATOR:
WING COMPUTER GROUP S.R.L.
DIRECTOR PROIECT:
Prof. Eng. Octavian Mihai GHIȚĂ, PhD.

PARTENER:
POLITEHNICA UNIVERSITY OF BUCHAREST
RESPONSABIL PROIECT:
Prof. Eng. Radu Florin PORUMB, PhD.